Wednesday 3 November 2021

Building ( & rigging) the Airfix Swordfish in 72nd scale (3)

 


..several disasters along the way - including snapping the outboard struts when cementing the wings as I squeezed them together. At that point the model nearly ended up in the bin. Too distraught to take a pic. But with a touch of super glue, repairs were quickly made. And so the Swordfish is nearly finished. 

Rigging!

I'm gradually getting the hang of this in 72nd scale - my third rigged biplane on this blog (in 11 years of posting) so I'm now feeling confident enough to provide a quick guide;

- drill locating holes with pin drill or similar in the wings/cowl/tailplane pre-assembly

- using a pin (drill) or similar apply viscous super glue to the hole and using pointed tweezers hold a length of nylon thread until the glue 'grabs' it.  Apply 'accelerator' with a thin brush to the area to speed up this part of the process. Ideally the model should be held in a clamp or similar, but I've always managed without one of these.

- if there's one tip to pass on here, it is always glue 'down'  - inverting the model for the top wings, or better, 'rigging' the lower half of the top wing during construction. The thread then hangs down towards the lower wing, so you are not competing with 'gravity' when glueing. Similarly, don't cut the thread too short - too much 'tension' and the thread won't grip as easily of course....



No comments:

Post a Comment